Jirah Restorations mitigates and remediates water, mould, fire and Category 3 losses across South East Queensland, Townsville and Cairns. Every loss is classified to the applicable standard before the scope is written, every dry-out is monitored daily to a documented standard, and every file is complete at handover.
Technical work is led by a Managing Director who spent years on your side of the process, writing scopes for insurers and builders as first responder on site.
Before founding Jirah, David Luceno spent years on insurance-directed restoration work. He was first on site for losses across residential, unit and commercial properties — photographing, measuring, classifying and writing the scope submitted to the insurer or builder for approval, then executing the approved scope through to certificate of completion, dry readings and mould testing. He managed large-loss claims and multi-technician crews.
Jirah's documentation, scoping discipline and variation process are built around what an assessor needs to approve a scope and close a file. In the restoration industry since 2020.
Category and class of water (AS-IICRC S500:2025), or condition of environment (ANSI/IICRC S520), recorded on the report before the scope. The scope then has to justify itself against the classification — removal on a Category 1 loss needs a reason; retention on a Category 3 loss needs a reason.
Readings taken outward from the source until they match unaffected material in the same structure. Wall cavities, subfloor and adjoining rooms included. The affected area is measured, not assumed.
For each affected material, from readings on the same material where the loss didn't reach. Not a generic figure.
Dehumidification and air movement matched to affected area, materials and ambient conditions. Equipment placement and removal dated in the log.
Additional damage found during works is documented and submitted for approval before any additional work proceeds. Emergency mitigation to prevent further loss is the only exception, and it's recorded as such.
Retained seven years. Formatted for direct inclusion in a claim file.
| Area | On site | Notes |
|---|---|---|
| Redlands, Brisbane, Logan | Within 2 hours | Core service area |
| Ipswich, Gold Coast | Within 3 hours | |
| Sunshine Coast | Within 4 hours | |
| Townsville | 24 to 36 hours | Crew mobilised within 24 hours |
| Cairns | 36 to 48 hours | Crew mobilised within 24 hours |
| Elsewhere in Queensland | By arrangement | Capacity permitting |
Crews and equipment mobilise from Thornlands (Redlands, QLD). Approved subcontractors in North Queensland work to Jirah procedures and documentation; Jirah remains responsible for the conduct and quality of their work. Policyholders in Townsville and Cairns receive immediate mitigation guidance by phone from first contact.
Jirah Restorations makes seven commitments on every job, residential or commercial, insured or private.
Director accountability. Every Jirah project is the personal responsibility of the Managing Director. Concerns raised directly receive a response within 24 hours, seven days a week.
office@jirahrestorations.com.au1300 547 247
Scopes, reports, invoicing, direction-to-pay arrangements, panel enquiries. Dannielle Luceno, Operations Manager.