A water loss in a unit block is rarely one owner's problem. Water from a burst hose in unit 12 ends up in the ceiling of unit 8 and the common-area hallway between them, and the first question the committee asks isn't "how do we fix it" — it's "who pays."
We can't answer that for you; the boundary depends on your scheme's plan and the legislation. What we can do is document exactly where the water went and what it affected, so the strata manager and the committee can apply the boundary to facts instead of arguing about them.
Every affected area in a Jirah report is recorded by location, material and reading — not "water damage to unit 8" but which wall, which side of the wall, which ceiling, which section of hallway carpet. Photographs and thermal imaging are tagged to the location.
That gives the strata manager a document that maps directly onto the scheme's plan. Whether a wall lining or a ceiling is lot or common property is your determination to make under the Body Corporate and Community Management Act; ours is to make sure the evidence for where the damage actually is doesn't leave any room for interpretation.
In a building format plan, water travels through slabs, down service risers, along shared walls and into units that reported nothing. A loss assessed only in the unit where it started is under-scoped almost every time.
We map moisture outward from the source until the readings match dry material — across the unit boundary, into the common area, and into the units below and beside. Where we need access to a unit whose owner didn't call us, we tell you first and we go through you or the strata manager to arrange it.
Mould remediation and Category 3 losses in an occupied building need the work area sealed and the air filtered, so residents in the rest of the building aren't affected. We set containment, run HEPA filtration for the duration, and control access to the work area. Notices for affected residents can be provided for the strata manager to distribute.
Common-area work — hallways, lifts, foyers, basement car parks — is scheduled with the strata manager to minimise disruption, and out-of-hours where needed.
Confirm who we report to (strata manager, committee chair, or both), who authorises variations, and how the body corporate's insurer wants documentation.
Same day: what we found, where, the classification, what can't be saved, and what we're recommending. Written for the committee to read without translation.
Daily readings logged; any variation reported before we act on it; residents contacted directly before each attendance where their unit is involved.
The full file, location-tagged, plus a plain summary for the committee and the insurer.
Every affected area documented by location, material and reading — so lot and common property can be determined from evidence.
Water followed across unit boundaries until the readings say it stopped.
Residents contacted directly before we arrive, and containment set so the rest of the building isn't affected.
What can't be saved, in writing, early — so the committee conversation happens once.
Equipment out when the material is dry, verified against a documented standard.
Variations reported to you before we act.
Every Jirah job is my personal responsibility. If something isn't right, call or text me and you'll hear back within 24 hours, any day of the week.